Integrated intercepting pump station is an intelligent water treatment system integrating intercepting, lifting and treatment. It organically combines the intercepting well with the pumping station to realize the efficient collection, treatment and discharge of urban rainwater and sewage.
Structure diagram of pumping station
Clear river closure
Gravity self-flow: Urban sewage can directly flow into the sewage pipe network, so as to achieve interception in dry season. Pressure rise: In areas with high water level in the sewage pipe network, it is forced into the sewage pipe by water pump.
Initial rain interception
When the rainwater at the initial stage of rain flows into the intercepting pump station, the gate of the outlet is closed to prevent the initial sewage from entering the river. When the water level in the pumping station reaches the pump-starting height, the water pump is turned on, and the initial rainwater with high pollution in the well is lifted to the sewage pipe network for interception. With the continuous rainfall, when it is detected that the water level rises and the water pollution degree drops, the sewage interception valve is gradually closed, and at the same time, the drain gate is opened to discharge relatively clean rainwater.
Direct drainage in rainy season
When the rainfall reaches the limit, the sewage interception gate is closed, and the overflow gate is fully opened, so that the rainwater directly flows into the natural water body or depression to realize direct drainage in rainy season.
- Use: Urban rainwater and sewage diversion
- Origin:Fengxian District, China
- Price: negotiable
- Material:
Components |
Standard material |
Optional material |
Cylinder |
FRP |
HMPP,PE |
Head cover |
aluminium alloy |
FRP |
Staircase |
SUS304 |
aluminium alloy |
Vent pipe |
SUS304 |
PVC |
In-cylinder pipeline |
SUS304 |
SUS316,galvanizing |
Flange |
galvanizing |
SUS304,SUS316 |
Sluice valve |
cast iron |
SUS304 |
Check valve |
cast iron |
SUS304 |
Slideway |
SUS304 |
galvanizing |
Pump |
The core flow components are SUS304,and the rest are carbon steel. |
SUS304 |
Pump coupling |
cast iron |
SUS304 |
Maintenance platform |
FRP+Stainless steel edging |
galvanizing |
Pump station material matching table,select attachments according to requirements.
- Attachment: please refer to the attachment on the home page for details.
- Classification voltage: 380V 50Hz, and the voltage can be paid according to local demand.
http://www.korepumpstation.com/